jueves, 24 de agosto de 2017

U.S. Army seeks commercialization of 3D printed cement barracks

Ordered, concrete, and spanning 512 square-feet, the Construction Engineering Research Laboratory (CERL) in Champaign, Illinois, has revealed the successful construction of its first 3D printed barracks hut. The B-Hut is a product of the lab’s Automated Construction of Expeditionary Structures (ACES) project, that is now seeking commercialization with a North American industrial corporation. Expeditionary structures on-demand The semipermanent […]

from 3D Printing Industry

John

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation.

 

Copyright @2016